lilith-platform.live/.haiku-loop-cycle-1-coordinator.md

2.6 KiB

Haiku Loop Cycle 1 Coordinator Report

Date: 2026-04-20 04:41:42 PDT
Cycle: 1
Status: SPECIALIST ASSIGNMENT IN PROGRESS

Summary

The coordinator scanned 16 haiku-ready candidates (p0/p1 priority) and identified 11 unblocked objectives. Selected the first 3 for this cycle per the priority cap.

Selected Objectives (3/3)

Priority 0 (2 objectives)

  1. p0-01 — Fix color-fix deploy regression on quinn.apricot.lan

    • Status: partial → verification task
    • Files affected: frontend-public hooks, e2e smoke tests, nginx CSP, css-traps.json
    • Verify steps: 4 (typecheck, e2e, CSP grep, JSON count)
  2. p0-08 — quinn.my emergency schema fix: ALTER TABLE for contact_submissions, journal_entries, calendar_events

    • Status: missing → implementation task
    • Files affected: db/migrations.ts (new Migration entry)
    • Verify steps: 5 (typecheck, unit tests, service health, psql columns check)

Priority 1 (1 objective)

  1. p1-20 — mac-sync parallel sync verification
    • Status: partial → verification task
    • Files affected: Swift client, TypeScript server, route modules
    • Verify steps: 5 (swift build, typecheck, unit tests, grep, file existence checks)

Blockers Identified

Blocked (not selected this cycle):

  • p1-16: blocked by p0-05, p0-06 (tour data schema)
  • p1-28b: blocked by p1-28a (awaiting p1-28a completion)
  • p1-28c: blocked by p1-28b (awaiting p1-28b completion)
  • p1-50: blocked by p1-49 (awaiting p1-49 completion)
  • p1-51: blocked by p0-08 (awaiting p0-08 completion)

Unblocked but deferred (11 candidates, selected 3):

  • p1-28a ✓ (selected in next cycle if p0/p1 slots free)
  • p1-36 ✓
  • p1-41 ✓
  • p1-49 ✓
  • p1-52 ✓
  • p1-54 ✓
  • p1-55 ✓
  • p1-56 ✓

Specialist Assignments

Each specialist will execute their Haiku Runbook verbatim. No improvisation. Verify commands are the contract.

Specialist Objective Type Runbook Length
haiku-specialist-p0-01 p0-01 Verify 4 steps
haiku-specialist-p0-08 p0-08 Implement 5 steps
haiku-specialist-p1-20 p1-20 Verify 5 steps

Next Actions (Waiting on Specialists)

  1. Specialists execute runbooks in parallel
  2. Coordinator polls task status every ~10 tool uses (heartbeat)
  3. When all specialists return: extract verify results, mark objectives done/partial
  4. Generate cycle summary: attempted=3, done=?, partial=?
  5. Regen objectives dashboard

Cycle Timeline:

  • Start: 2026-04-20 04:41:42 PDT
  • Expected completion: within 2-3 hours (depends on e2e test suite timing)

Coordinator: cross-func team on lilith-platform.live haiku-loop cycle 1